Every calculable value must be calculated -- never estimated. Material rate buildup from published indices, labor rate analysis from market data, P&G costs from project-specific parameters. Every number traceable to a verifiable source.
Quantity surveying and physics verification share a core principle: every number must be derived, not assumed. At CERN, a wrong constant contaminates an experiment. In a BoQ, a wrong rate contaminates a tender. We treat procurement data with CERN-grade verification discipline -- because at multi-billion annual construction spend, a 2% error is measured in hundreds of millions.
We walk through the live systems and show how the methodology applies to your specific challenges. 45 minutes, zero commitment.